Air Liquide 4.0 Expansion

Project Summary

In 2008, Air Liquide expanded its global relationship with REC Group, the world’s number one producer of silicon materials for the solar photovoltaic industry, at their Moses Lake, Washington facility to supply carrier gases to a new polysilicon manufacturing plant.  Since 2005, IMCO has maintained a presence at REC Moses Lake and has performed various infrastructure phases of construction for the new manufacturing plant.  This proved to give IMCO a cutting edge in helping Air Liquide build their process facilities and integrate them into the existing refineries all while keeping the plant active.

IMCO Self-Performed Scopes of Work:

• Site earthwork preparation.
• Sub grade preparation.
• Structural foundations.
• Exterior concrete paving.
• U/G piping.
• Supply and erect pre-manufactured metal building.
• Architectural package.
• Site electrical.

Details

Location

Moses Lake, WA

Owner

Air Liquide Electronics, US L.P.

Contract Amount

$1.9 Million

Engineer

Air Liquide Electronics, US L.P.

Duration

October 2008 - December 2008

Project Highlights

IMCO and Air Liquide continue to work together on various large, medium and small works projects at the Moses Lake site and have maintained a great working relationship stemming from this work together on 4.0 Expansion. The project was delivered to Air Liquide 60 days ahead of schedule.