Sultan, WA

Progressive Design-Build Everett Water Filter Plant Upgrades

Major upgrades require plant operations throughout construction during collaborative delivery at municipal water facility for the City of Everett, WA

The City of Everett owns and operates a water filter plant and regional water distribution system that serves more than 675,000 customers daily. The water filter plant was originally constructed in 1983 and now has aging infrastructure elements in need of replacement and upgrade. IMCO Construction teamed with engineering firm Kennedy Jenks and was selected to deliver this progressive design-build project. The scope includes design and construction of a fluoride tank and building improvements, aluminum and polymer tank replacement, flocculation basin improvements, and east clearwell gate improvements.

The project team began the design phase in the spring of 2022. The construction schedule was from 2023 through most of 2025.

Owner

City of Everett

Contract Amount

$28 million

Duration

May 2022 - 2025

Construction Services

Design-BuildPreconstruction Services