Bellingham, WA
Downtown Bellingham Lift Station Capacity Improvements
Building resilient infrastructure to expand the City's wastewater capacity, improving the sewer transport system and lift station capacity to 18 million gallons per day
This project provides improvements to the existing lift station and force main pipes to provide adequate pumping capacity to facilitate future sewage conveyance at the Roeder Lift Station along the downtown Bellingham waterfront. The Roeder Lift Station Capacity Improvements project includes of construction of a new sanitary sewer lift station, associated structures, storm sewer, gravity sanitary sewer, force main sanitary sewer, water main, site and street restoration, erosion control, traffic control, and demolition of portions of the existing lift station. To execute this contract, IMCO Construction crews installed a sheet pile wall next to the railway and a cell to protect the 30-foot-deep structure. The team then poured-concrete building walls, which are 40 inches thick. Work is taking place along a busy roadway.
Owner
City of Bellingham
Contract Amount
$17.5 million
Duration
September 2023 - present
Anticipated Completion
2026
Construction Services
Design-Bid-Build