Yesler Bridge Rehabilitation
Located in the heart of Seattle, this nationally recognized project won the American Public Works Association National Project of the Year in the Historical Restoration/Preservation category and ENR Northwest Best Project.






The Yesler Bridge Rehabilitation Project, Yesler Way over 4th Avenue S, was also warded the 2019 ACEC Engineering Excellence, National Silver Award for Structural Systems, multiple APWA awards, and the 2018 ENR Northwest Best Renovation/Restoration project.
IMCO Construction rebuilt the historic Yesler Bridge in downtown Seattle, removing the existing bridge and constructing a new pier foundation and abutment that supports the lateral pressure of the arch at the end of the bridge. IMCO crews performed rehabilitation of the existing abutment and historical elements, building a new steel girder bridge, and making improvements to sidewalks, roadway surfaces, and existing railings for improved pedestrian and traffic safety. Historical elements such as decorative pedestrian railings, fascia girders, ornamental corbels, girder columns and cladding, were carefully removed, rehabilitated, and re-incorporated into the new construction to ensure the key historical features of the bridge were preserved.
The Yesler Way Bridge is located in the Pioneer Square Historic District of Seattle and serves as the gateway to downtown. The 100-year-old structure was a non-redundant, three-span superstructure. The columns were less than 11 inches from the 4th Avenue sidewalk curbs, with no other barrier from potential vehicle collisions. The bridge was constructed before seismic design codes were in place. The bridge also connects traffic spanning east to west across Interstate-5 and is a vital route for residents, commuters, and workers.
The primary goals for the project were to improve traffic patterns and increase vehicle and pedestrian safety. The Terrace Street intersection was upgraded by improving the visibility when vehicles entered the intersection. Parking was reduced on the bridge deck and sidewalks were enlarged to facilitate pedestrian patterns across Yesler Way and Terrace Street. Improved lighting, widened sidewalks, and the addition of a bike lane under the bridge on 4th Avenue improved safety for bikers and pedestrians traveling on 4th Avenue.
The Yesler Way Bridge project uniquely balanced historic preservation while providing a safer, better functioning, and more durable bridge. Preserving the iconic bridge’s key historic features was critical because the bridge is a visual gateway and landmark for the City’s historic districts. Yesler Way and Terrace Street were closed during the life of the project, but vehicle and pedestrian traffic on 4th Avenue were maintained. The project required careful scheduling and tight work areas, while keeping existing facilities operating during construction.
Owner
City of Seattle Department of Transportation
Contract Amount
$11.1 Million
Duration
May 2016 - October 2017
Construction Services
Design-Bid-BuildVirtual Design Construction