Jul25
2014IMCO installs 54-inch outfall into Sammamish
Event Date:
Friday, July 25, 2014 - 12:00am
IMCO's Downtown Redmond Way Stormwater Treatment Facility project team executes installation of a 54-inch concrete outfall into the Sammamish River within a two week in-water work window, and does so ahead of schedule.
