Hydrogen Production and Fueling Facility
Project Summary
Douglas County PUD has contracted IMCO to build Washington State’s first large-scale hydrogen production facility which will use water and power from the Wells Dam facility to produce hydrogen through an electrolysis process. Hydrogen does not emit carbon and is considered by many to be the energy source of the future. This contract includes construction of a pre-cast tilt-up building, a large mechanical scope, and the installation of hydrogen producing equipment.